Substation fire cuts power to Tolko Armstrong plants

Dec 2022Published 28 Sept 2026

Estimated damage ModelledFigure hidden: shown to subscribersLow confidencesupply cut for •• daysSee the figure: 14 days freeFull estimateHow? Know the real figure?

Companies named in this entry: Tolko Industries

A fire in the company substation at the Tolko Industries Armstrong division knocked out power to the plywood and lumber plants. Neither plant was in operation at the time. The extent of the damage had not been determined when the report was published. An onsite cogeneration plant was not affected because it is supplied from a different substation.

  1. A fire in a site substation can remove supply to an entire industrial site even when process plant is not running.
  2. Placing onsite generation on a separate substation can limit the effect of a single substation fire.
  3. Damage and restoration time should be confirmed before operations resume.

Published 2026-09-28. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

Get the next one like this

One email when a newly reported incident is confirmed, at most two a day, plus a Monday digest. Free, no account needed, unsubscribe in one click.

By subscribing you agree to the privacy policy.

Related incidents

Grid infrastructure incidents in Canada: 10 entries, with a free alert for the next one.

Browse the full register or submit an incident.