Fire at Metairie substation leaves more than 10,000 without power
June 2018Published 25 Sept 2026Responsible editor: Chief Editor
- Where
- Cleary Avenue substation in Metairie
- Operator
- Entergy
- What
- fire in a piece of equipment
- Response
- crews responded just before 5 p.m., under control by 5 p.m.
- Cause
- Not reported
Get the next one by email
Free alerts on grid infrastructure incidents in the United States, and an email when EIR-1292 is updated. No account needed; unsubscribe in one click.
Confirm your email and every substation and transformer incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Entergy
What happened
On 29 June 2018 a fire occurred at an Entergy power substation at Cleary Avenue and Iota Street in central Metairie. The East Bank Consolidated Fire Department responded just before 5 p.m. Entergy said the fire was in a piece of equipment. Adjacent equipment had to be de-energised so crews could extinguish it safely. The fire was under control as of 5 p.m. Entergy reported 10,506 residences and businesses without power in an area bordered by Veterans Memorial Boulevard, Airline Drive, Transcontinental Drive and North Causeway Boulevard. The exact location and cause were not immediately available. Restoration was expected around 7:30 p.m.
Contributing factors
The cause was not immediately available. The only reported operational factor is that adjacent equipment had to be de-energised so the fire could be extinguished safely.
Lessons learned
- Substation fire response can require adjacent equipment to be de-energised before crews can work safely, so operators should keep an isolation plan that the fire service can use.
- A fire in one piece of equipment can still cut supply across a wide area when neighbouring plant must be taken out of service.
- Until the cause is known, early outage and restoration figures should be treated as provisional and checked against later utility reports.
More lessons on fire suppression and firefighting, outages, backup supply and restoration, from every incident on the register.
Not yet known
- Exact location of the fire inside the substation
- Model and age of the equipment
- Duration of the power outage
This entry is updated when these are reported. Get an alert for the next one like it.
Source
Published 2026-09-25. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.