Cable failure causes explosion at T&TEC substation in Reform, Trinidad
June 2021Published 18 Sept 2026Responsible editor: Chief Editor
- Where
- T&TEC substation in Reform
- Operator
- T&TEC
- What
- Explosion from 12 kV cable failure
- Injuries
- None reported
- Cause
- Failure of a 12 kV medium voltage cable
Get the next one by email
Free alerts on grid infrastructure incidents in Trinidad and Tobago, and an email when EIR-1044 is updated. No account needed; unsubscribe in one click.
Confirm your email and every substation and transformer incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): T&TEC, Trinidad and Tobago Electricity Commission
What happened
An explosion occurred at the Trinidad and Tobago Electricity Commission (T&TEC) substation in Reform at around 1am. The incident was caused by the failure of a 12 kV medium voltage cable. Video footage circulating on social media showed plumes of smoke, fire and rumbling noises from the plant. The fault caused a disruption to electricity supply for customers in Bonne Aventure and other areas of Gasparillo. According to T&TEC's Area Manager, the system's built-in safety mechanism de-energised the circuit once the fault occurred, isolating the affected section.
Repair crews transferred customers to alternative supply and carried out repairs to the damaged cable. Power was restored to affected customers within approximately two hours. No injuries were reported as a result of the incident.
Contributing factors
The explosion was attributed to the failure of a 12 kV medium voltage cable at the substation.
Lessons learned
- A 12 kV cable failure at a substation can produce smoke and noise, so operators should rely on automatic isolation rather than immediate on-site entry.
- Medium voltage cable faults at substations require pre-planned transfer routes to limit customer outage time to two hours or less.
- Visible plumes of smoke and fire after a cable fault do not always mean major damage if the protection system isolates the section quickly.
More lessons on electrical protection and isolation, from every incident on the register.
Not yet known
- Exact cause of the cable failure
- Age and model of the failed cable
- Cost of repairs and replacement
This entry is updated when these are reported. Get an alert for the next one like it.