Wind turbine nacelle catches fire at Windy Hill wind farm in Ravenshoe
Nov 2018Published 17 Sept 2026Responsible editor: Chief Editor
- Where
- Windy Hill wind farm near Ravenshoe, Queensland
- Operator
- Ratch
- What
- Wind turbine nacelle caught fire
- Injuries
- None reported
- Response
- Queensland Fire and Emergency Services contained and extinguished the fire
Get the next one by email
Free alerts on wind (onshore) incidents in Australia, and an email when EIR-1010 is updated. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Ratch
What happened
A wind turbine nacelle caught fire at the Windy Hill wind farm near Ravenshoe, Queensland. Queensland Fire and Emergency Services crews attended from around 3pm and worked to contain the blaze, remaining on site to prevent it spreading into surrounding grassland. The fire was confined to the nacelle, the housing that contains the turbine's generating components, and was extinguished. A Ratch spokesperson said there were no injuries to Ratch or TWPS personnel or the public, and that the company was not aware of any property damage or interruption to local electricity supply.
Emergency services established an exclusion zone around the affected turbine as a precaution. It was reported as the first fire at the 20-turbine wind farm since it began operating in 2000. The cause was not known at the time of reporting, with the operator stating that technicians would carry out an investigation.
Contributing factors
Not reported. The operator stated the cause would not be known until an investigation by technicians was completed.
Lessons learned
- A nacelle fire at a wind turbine must be fought from inside or by remote means, so operators should fit early detection and automatic isolation.
- A nacelle fire can spread to dry grassland, so an exclusion zone and rapid liaison with fire services must be in the emergency plan.
- A fire at a 20-turbine site with no prior incidents since 2000 still requires full investigation before restarting the turbine.
More lessons on structural integrity and turbines, investigation and fleet-wide checks, from every incident on the register.
Not yet known
- Turbine model and age
- Duration of any outage
- Cost of repairs
This entry is updated when these are reported. Get an alert for the next one like it.
Source
Published 2026-09-17. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.