Wind (onshore)Sweden2015

Bolt failure reported as cause of 2015 Vestas turbine tower collapse in Sweden

EIR-0855

Provisional entry. Confirmed: an industry report states a Vestas turbine tower in Sweden collapsed in 2015 and that tower bolt failure was the cause. Not yet known: the site, turbine model, exact date, any injuries and the investigating body, as only the headline and feed summary were available. Next update: 17 September 2026.

A Vestas wind turbine is reported to have collapsed in Sweden in 2015. An industry news report published in February 2017 states that failure of the tower bolts led to the collapse. The site, turbine model, capacity, date and whether anyone was hurt are not reported in the available source material, which is a headline and feed summary only.

Failure of tower bolts, according to the headline of the industry report. No further technical detail is available in the source.

  1. Bolted tower connections are a load path whose integrity depends on correct installation and torque, and should be covered by inspection regimes.
  2. Operators should track published structural failure findings for their turbine types and check whether the same connection details apply to their fleet.
  3. Publishing sufficient technical detail from structural failure investigations helps other operators assess comparable risks.

Published 2026-09-15. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

Get the next one like this

One email when a newly reported incident is confirmed, at most two a day, plus a Monday digest. Free, no account needed, unsubscribe in one click.

By subscribing you agree to the privacy policy.

Related incidents

Wind (onshore) incidents in Sweden: 8 entries, with a free alert for the next one.

Browse the full register or submit an incident.