Transformer explosions and fire cut power to Arta villages, Greece
Aug 2026Published 7 Sept 2026Responsible editor: Chief Editor
- Where
- Grammenitsa Extra High Voltage Center, Arta region, western Greece
- Operator
- PPC
- What
- Successive explosions in a transformer triggered fires
- Response
- Fire crews worked around downed live power cables
- Outcome
- Power fully restored by mid-morning
Get the next one by email
Free alerts on grid infrastructure incidents in Greece, and an email when EIR-0188 is updated. No account needed; unsubscribe in one click.
Confirm your email and every substation and transformer incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
What happened
Several villages in the Arta region of western Greece lost electricity for several hours after powerful successive explosions occurred in a transformer at the Grammenitsa Extra High Voltage Center, operated by power utility PPC. The explosions, which happened shortly before midnight, triggered two small fires within the substation. The fire then spread to nearby grassland and forested areas. Fire crews attending the scene had to work around downed live power cables, which created a risk of electrocution during firefighting operations.
Settlements in the mountainous part of the prefecture and in the Kambos area were affected by the outage. Power was fully restored to all affected villages by mid-morning, according to state broadcaster ERT.
Contributing factors
Transformer explosions at the extra-high-voltage substation caused fire to break out and spread to adjacent grassland and forest; downed live cables complicated the firefighting response. The underlying cause of the transformer explosions was not reported.
Lessons learned
- Transformer explosions at extra-high-voltage substations can ignite nearby vegetation, so operators should maintain firebreaks and clear vegetation around the site.
- Downed live cables at a substation fire create an electrocution risk for fire crews, so utilities must enable rapid de-energisation protocols.
- Network redundancy and clear restoration plans limit outage length for villages after a substation failure.
More lessons on maintenance, inspection and ageing assets, worker safety and safe systems of work, outages, backup supply and restoration, from every incident on the register.
Not yet known
- Cause of the transformer explosions
- Transformer model and age
- Cost of damage and repairs