Yearby Village - Tees Solar Farm

Operator EDF Energy Renewables

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 31 May 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Yearby Village - Tees Solar Farm is a 49.9 MW solar farm in Kirkleatham, Cleveland, United Kingdom. Its planning application (R/2023/0002/FFM) went to Redcar and Cleveland on 3 January 2023 and was granted on 30 April 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 41 other energy sites within 10 km, 11 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

EDF ENERGY RENEWABLES LIMITED (06456689), active, since 2007. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Yearby Village - Tees Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1502, Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre, 32 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre32 kmMinor
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton53 kmSignificant
EIR-14992025Solar panels linked to fires at council buildings in Northumberland65 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
EDF Energy Renewables
Location
Near Yearby Village, South Of Redcar, Yearby, Redcar, Cleveland, TS10 4SG, United Kingdom
Planning authority
Redcar and Cleveland
Planning application
R/2023/0002/FFM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for R/2023/0002/FFM, with what the planning evidence pack adds for this site.

Every application in Redcar and Cleveland · Alerts for applications and incidents near here

  • 3 January 2023 Planning application submitted
  • 30 April 2024 Planning permission granted
  • 30 April 2027 Planning permission runs out

None found. The register holds no published incident that names Yearby Village - Tees Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Yearby Village - Tees Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Yearby Village - Tees Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Yearby Village - Tees Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 31 May 2024.
Where is Yearby Village - Tees Solar Farm?
In Kirkleatham, Cleveland, United Kingdom (postcode TS10 4SG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).