← Back to Flintshire

Energy sites / United Kingdom / Flintshire

Solar · United Kingdom

Wood Farm Solar Park (linked site)

Appeal Refused5 MWChecked 6 October 2026Last changed in the dataset 23 December 2016

Technology
Solar
Capacity
5 MW
Status
Appeal Refused
Operator or applicant
SEP Solar
Location
Opp. Kingston Lane, Manor Farm, Deeside Lane, Sealand, Chester, Flintshire, CH1 6BP, United Kingdom
Planning authority
Flintshire
Planning application
53687
Appeal reference
APP/A6835/A/16/3151112

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 11 May 2015 Planning application submitted
  • 4 April 2016 Planning permission refused
  • 13 July 2016 Appeal lodged
  • 14 December 2016 Appeal refused

None found. The register holds no published incident that names Wood Farm Solar Park (linked site). If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.