Solar · United Kingdom
WM Morrison Supermarkets, Long Rock - Solar Panels
Operator Morrisons
Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 12 December 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
WM Morrison Supermarkets, Long Rock - Solar Panels is a 0.3 MW solar farm on the edge of Penzance, Cornwall, United Kingdom. Its planning application (PA22/09226) went to Cornwall on 19 October 2022 and was granted on 30 November 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 11 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when WM Morrison Supermarkets, Long Rock - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
MORRISONS LIMITED (02280567), active, since 1988. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for WM Morrison Supermarkets, Long Rock - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1543, Fire damages roof space and solar panels on bungalow in Crowan, 16 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1543 | 2017 | Fire damages roof space and solar panels on bungalow in Crowan | 16 km | Significant |
| EIR-1540 | 2018 | Fire in solar panel on house roof in Flushing | 32 km | Minor |
| EIR-0474 | 2025 | Solar panel fire tackled on rooftop near Newquay beach | 44 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Morrisons
- Location
- WM Morrison Supermarkets Plc Long Rock, Cornwall, TR18 3RF, United Kingdom
- Planning authority
- Cornwall
- Planning application
- PA22/09226
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PA22/09226, with what the planning evidence pack adds for this site.
Every application in Cornwall · Alerts for applications and incidents near here
Timeline
- 19 October 2022 Planning application submitted
- 30 November 2022 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names WM Morrison Supermarkets, Long Rock - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has WM Morrison Supermarkets, Long Rock - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names WM Morrison Supermarkets, Long Rock - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of WM Morrison Supermarkets, Long Rock - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 December 2022.
- Where is WM Morrison Supermarkets, Long Rock - Solar Panels?
- On the edge of Penzance, Cornwall, United Kingdom (postcode TR18 3RF).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).