Offshore wind · United Kingdom
TwinHub (previously called Wave Hub Floating Wind)
Operator Hexicon
Awaiting Construction32 MWData checked 16 November 2026Source record dated 13 December 2021
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
TwinHub (previously called Wave Hub Floating Wind) is a 32 MW offshore wind farm in Hayle, United Kingdom. Its planning application (PA18/10363) went to The Planning Inspectorate - National Infrastructure on 31 October 2018 and was granted on 12 January 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 19 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when TwinHub (previously called Wave Hub Floating Wind) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, offshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for TwinHub (previously called Wave Hub Floating Wind) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 14 comparable offshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0447, Fire destroyed turbine at Scroby Sands Offshore Wind Farm in 2023, 564 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0447 | 2023 | Fire destroyed turbine at Scroby Sands Offshore Wind Farm in 2023 | 564 km | Major |
| EIR-0029 | 2024 | Second blade failure of 2024 at Dogger Bank A offshore wind farm | 590 km | Significant |
| EIR-0758 | 2024 | Service vessel collision damages turbine at Orsted's Hornsea Project One offshore wind farm | 590 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 11 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Offshore wind
- Capacity
- 32 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Hexicon
- Location
- Wave Hub 16km North Of, St Ives Head, Hayle, Offshore, TR27 4DD, United Kingdom
- Planning authority
- The Planning Inspectorate - National Infrastructure
- Planning application
- PA18/10363
- Turbines
- 4, 220 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PA18/10363, with what the planning evidence pack adds for this site.
Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here
Timeline
- 31 October 2018 Planning application submitted
- 12 January 2022 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names TwinHub (previously called Wave Hub Floating Wind). If you know of one, report it (confidential reports are anonymised).
Questions
- Has TwinHub (previously called Wave Hub Floating Wind) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names TwinHub (previously called Wave Hub Floating Wind); it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of TwinHub (previously called Wave Hub Floating Wind)?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 December 2021.
- Where is TwinHub (previously called Wave Hub Floating Wind)?
- In Hayle, United Kingdom (postcode TR27 4DD).