Solar · United Kingdom
Land at Boslandew Hill
Operator Far West Solar
Appeal Refused1 MWData checked 16 November 2026Source record dated 1 February 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Land at Boslandew Hill is a 1 MW solar farm 3.8 km south of Penzance, Cornwall, United Kingdom. Its planning application (PA15/05386) went to Cornwall on 3 July 2015 and was refused on appeal on 5 January 2017. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 6 other energy sites within 10 km, 4 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Land at Boslandew Hill changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Appeal Refused
- Operator or applicant
- Far West Solar
- Location
- Land At Boslandew Hill, Paul, Penzance, Cornwall, TR19 6UD, United Kingdom
- Planning authority
- Cornwall
- Planning application
- PA15/05386
- Appeal reference
- APP/D0840/W/16/3146032
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PA15/05386, with what the planning evidence pack adds for this site.
Every application in Cornwall · Alerts for applications and incidents near here
Timeline
- 3 July 2015 Planning application submitted
- 23 December 2015 Planning permission refused
- 15 March 2016 Appeal lodged
- 5 January 2017 Appeal refused
Incidents on the register at this site
None found. The register holds no published incident that names Land at Boslandew Hill. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Land at Boslandew Hill had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Land at Boslandew Hill; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Land at Boslandew Hill?
- Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 1 February 2017.
- Where is Land at Boslandew Hill?
- 3.8 km south of Penzance, Cornwall, United Kingdom (postcode TR19 6UD).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).