Solar · United Kingdom

Wiggin Hill Solar Farm - Phase 2

Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited

Operational4.1 MWData checked 16 November 2026Source record dated 28 May 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Wiggin Hill Solar Farm - Phase 2 is a 4.1 MW solar farm on the edge of Saint Ives, Cambridgeshire, United Kingdom. Its planning application (1301787FUL) went to Huntingdonshire on 25 November 2013 and was granted on 14 February 2014. It has been operating since 14 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 20 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 178 other sites and 406 energy sites within 40 km for Wiggin Hill Solar Farm - Phase 2

Members see the sites and incidents around this one, and every record behind them.

LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
4.1 MW (this record)
All phases
10.9 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lightsource Renewable Energy
Owner
Lightsource Holdings 3 Limited
Location
Land North Of Wiggin Hill Old Ramsey Road St Ives, Cambridgeshire, PE27 3, United Kingdom
Planning authority
Huntingdonshire
Planning application
1301787FUL
First operating
2015

This record is 4.1 MW, one part of a site built in phases. With Wiggin Hill Solar Farm - Phase 1 (6.8 MW) the phases on the register add up to 10.9 MW. Wiggin Hill Solar Farm - Phase 1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 1301787FUL, with what the planning evidence pack adds for this site.

Every application in Huntingdonshire · Alerts for applications and incidents near here

  • 25 November 2013 Planning application submitted
  • 14 February 2014 Planning permission granted
  • 14 November 2014 Construction started
  • 14 March 2015 Operational

None found. The register holds no published incident that names Wiggin Hill Solar Farm - Phase 2. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Wiggin Hill Solar Farm - Phase 2 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wiggin Hill Solar Farm - Phase 2; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Wiggin Hill Solar Farm - Phase 2?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 May 2015.
Where is Wiggin Hill Solar Farm - Phase 2?
On the edge of Saint Ives, Cambridgeshire, United Kingdom (postcode PE27 3).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).