Solar · United Kingdom
Meadow Lane Park and Ride
Operator Cambridgeshire CC & Bouygues Energies
Under Construction0.9 MWData checked 16 November 2026Source record dated 25 March 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Meadow Lane Park and Ride is a 0.9 MW solar farm in Saint Ives, Cambridgeshire, United Kingdom. Its planning application (H/5016/16/CC) went to Huntingdonshire on 7 April 2017. Construction started on 25 March 2022. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 21 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Meadow Lane Park and Ride changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Meadow Lane Park and Ride sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1262, Fire reported on solar-panel roof at Fitzwilliam College auditorium, 20 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1262 | 2024 | Fire reported on solar-panel roof at Fitzwilliam College auditorium | 20 km | Minor |
| EIR-1155 | 2024 | Rooftop solar fire contained on a Peterborough warehouse roof | 30 km | Significant |
| EIR-1493 | 2026 | Solar panels catch fire on Bedford warehouse roof | 31 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Cambridgeshire CC & Bouygues Energies
- Location
- Park and Ride Site, The Meadow, Meadow Lane, St Ives, Cambridgeshire, PE27 4LG, United Kingdom
- Planning authority
- Huntingdonshire
- Planning application
- H/5016/16/CC
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for H/5016/16/CC, with what the planning evidence pack adds for this site.
Every application in Huntingdonshire · Alerts for applications and incidents near here
Timeline
- 7 April 2017 Planning application submitted
- 25 March 2022 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Meadow Lane Park and Ride. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Meadow Lane Park and Ride had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Meadow Lane Park and Ride; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Meadow Lane Park and Ride?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 25 March 2022.
- Where is Meadow Lane Park and Ride?
- In Saint Ives, Cambridgeshire, United Kingdom (postcode PE27 4LG).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).