Onshore wind · United Kingdom
Wether Hill
Operator Scottish Power/CRE Energy
Operational18.2 MWData checked 16 November 2026Source record dated 25 September 2014
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Wether Hill is a 18.2 MW wind farm 29 km south-east of Cumnock, Dumfries and Galloway, United Kingdom. Its planning application (03P30746) went to Dumfries and Galloway on 8 January 2004 and was granted on 1 March 2005. It has been operating since 1 May 2007. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 20 other energy sites within 10 km, 13 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Wether Hill changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 18.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Scottish Power/CRE Energy
- Location
- MoniaiveDumfries, Dumfries and Galloway, United Kingdom
- Planning authority
- Dumfries and Galloway
- Planning application
- 03P30746
- First operating
- 2007
- Turbines
- 14
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 03P30746, with what the planning evidence pack adds for this site.
Every application in Dumfries and Galloway · Alerts for applications and incidents near here
Timeline
- 8 January 2004 Planning application submitted
- 1 March 2005 Planning permission granted
- 1 August 2006 Construction started
- 1 May 2007 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Wether Hill. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Wether Hill had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Wether Hill; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Wether Hill?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 25 September 2014.
- Where is Wether Hill?
- 29 km south-east of Cumnock, Dumfries and Galloway, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).