Planning pack for this site, £295Other options

Solar · United Kingdom

Welsh Way - Solar PV Farm

Operator Uniper UK Limited · Owner Innova Capital Limited

Awaiting Construction13 MWData checked 16 November 2026Source record dated 24 August 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Welsh Way - Solar PV Farm is a 13 MW solar farm 11 km east of Cirencester, Gloucestershire, United Kingdom. Its planning application (23/03907/FUL) went to Cotswold on 12 December 2023 and was granted on 23 September 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 11 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

INNOVA CAPITAL LIMITED (09697757), active, since 2015. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Welsh Way - Solar PV Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 7.7 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire7.7 kmSignificant
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries15 kmMajor
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol60 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
13 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Uniper UK Limited
Owner
Innova Capital Limited
Location
Welsh Way, Fairford, Gloucestershire, GL7 5TA, United Kingdom
Planning authority
Cotswold
Planning application
23/03907/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/03907/FUL, with what the planning evidence pack adds for this site.

Every application in Cotswold · Alerts for applications and incidents near here

  • 12 December 2023 Planning application submitted
  • 23 September 2024 Planning permission granted
  • 23 September 2027 Planning permission runs out

None found. The register holds no published incident that names Welsh Way - Solar PV Farm. If you know of one, report it (confidential reports are anonymised).

Has Welsh Way - Solar PV Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Welsh Way - Solar PV Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Welsh Way - Solar PV Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 24 August 2026.
Where is Welsh Way - Solar PV Farm?
11 km east of Cirencester, Gloucestershire, United Kingdom (postcode GL7 5TA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).