Solar · United Kingdom
Water Eaton Farm / Port Farm
Operator Foresight& Vogt solar
Operational34.8 MWData checked 16 November 2026Source record dated 2 March 2018
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Water Eaton Farm / Port Farm is a 34.8 MW solar farm 7.5 km west of Highworth, Wiltshire, United Kingdom. Its planning application (14/04326/FUL) went to Wiltshire on 25 April 2014 and was granted on 21 August 2014. It has been operating since 25 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 48 other energy sites within 10 km, 36 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Water Eaton Farm / Port Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 34.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Foresight& Vogt solar
- Location
- Land at Water Eaton Farm, Latton, Wiltshire, SN6 6JT, United Kingdom
- Planning authority
- Wiltshire
- Planning application
- 14/04326/FUL
- First operating
- 2015
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 14/04326/FUL, with what the planning evidence pack adds for this site.
Every application in Wiltshire · Alerts for applications and incidents near here
Timeline
- 25 April 2014 Planning application submitted
- 21 August 2014 Planning permission granted
- 1 October 2014 Construction started
- 25 March 2015 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Water Eaton Farm / Port Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Water Eaton Farm / Port Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Water Eaton Farm / Port Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Water Eaton Farm / Port Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 2 March 2018.
- Where is Water Eaton Farm / Port Farm?
- 7.5 km west of Highworth, Wiltshire, United Kingdom (postcode SN6 6JT).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).