Solar · United Kingdom

Chapel Farm

Operator Public Power Solutions& Swindon Borough Council · Owner Nextpower Chapel Limited

Operational5 MWData checked 16 November 2026Source record dated 24 August 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Chapel Farm is a 5 MW solar farm 6.6 km north of Swindon, Wiltshire, United Kingdom. Its planning application (S/LDO/15/1182) went to Swindon on 6 July 2015 and was granted on 10 August 2015. It has been operating since 31 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 61 other energy sites within 10 km, 43 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 1 other site and 364 energy sites within 40 km for Chapel Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Public Power Solutions& Swindon Borough Council
Owner
Nextpower Chapel Limited
Location
Chapel Farm, Lower Widhill Farm Lane, Blunsdon, Wiltshire, SN26 8DD, United Kingdom
Planning authority
Swindon
Planning application
S/LDO/15/1182
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S/LDO/15/1182, with what the planning evidence pack adds for this site.

Every application in Swindon · Alerts for applications and incidents near here

  • 6 July 2015 Planning application submitted
  • 10 August 2015 Planning permission granted
  • 18 January 2017 Construction started
  • 31 March 2017 Operational

None found. The register holds no published incident that names Chapel Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Chapel Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Chapel Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Chapel Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 24 August 2017.
Where is Chapel Farm?
6.6 km north of Swindon, Wiltshire, United Kingdom (postcode SN26 8DD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).