← Back to Wiltshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Mopes Lane, Purton - Solar Farm

Operator Spring Dev 08 Limited

Awaiting Construction20 MWData checked 16 November 2026Source record dated 8 December 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Mopes Lane, Purton - Solar Farm is a 20 MW solar farm 6.5 km north of Royal Wootton Bassett, Wiltshire, United Kingdom. Its planning application (PL/2021/10405) went to Wiltshire on 3 November 2021 and was granted on 15 April 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 86 other energy sites within 10 km, 42 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Mopes Lane, Purton - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2109, Solar installer falls through fragile farm roof at Kemble, suffering brain injuries, 13 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries13 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire14 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol51 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Spring Dev 08 Limited
Location
Hills Minerals & Waste Ltd, Mopes Lane, Purton, Wiltshire, SN5 4HG, United Kingdom
Planning authority
Wiltshire
Planning application
PL/2021/10405

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/2021/10405, with what the planning evidence pack adds for this site.

Every application in Wiltshire · Alerts for applications and incidents near here

  • 3 November 2021 Planning application submitted
  • 15 April 2023 Planning permission granted
  • 15 April 2026 Planning permission expired

None found. The register holds no published incident that names Mopes Lane, Purton - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Mopes Lane, Purton - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mopes Lane, Purton - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Mopes Lane, Purton - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 December 2021.
Where is Mopes Lane, Purton - Solar Farm?
6.5 km north of Royal Wootton Bassett, Wiltshire, United Kingdom (postcode SN5 4HG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).