Solar · United Kingdom
Duke Of Gloucester Barracks
Operator Ministry of Defence
Operational1.4 MWData checked 16 November 2026Source record dated 11 January 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Duke Of Gloucester Barracks is a 1.4 MW solar farm 4.9 km south-east of Cirencester, Gloucestershire, United Kingdom. Its planning application (19/04344/FUL) went to Cotswold on 26 November 2019 and was granted on 4 May 2020. It has been operating since 1 September 2021. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 23 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Duke Of Gloucester Barracks changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 1.4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Ministry of Defence
- Location
- Duke Of Gloucester Barracks Ai, Cricklade Road, South Cerney, Cirencester, Gloucestershire, GL7 5RD, United Kingdom
- Planning authority
- Cotswold
- Planning application
- 19/04344/FUL
- First operating
- 2021
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 19/04344/FUL, with what the planning evidence pack adds for this site.
Every application in Cotswold · Alerts for applications and incidents near here
Timeline
- 26 November 2019 Planning application submitted
- 4 May 2020 Planning permission granted
- 1 June 2021 Construction started
- 1 September 2021 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Duke Of Gloucester Barracks. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Duke Of Gloucester Barracks had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Duke Of Gloucester Barracks; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Duke Of Gloucester Barracks?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 11 January 2022.
- Where is Duke Of Gloucester Barracks?
- 4.9 km south-east of Cirencester, Gloucestershire, United Kingdom (postcode GL7 5RD).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).