← Back to Gloucestershire

Energy sites / United Kingdom / Gloucestershire

Solar · United Kingdom

Cirencester Solar Farm

Operational23 MWChecked 6 October 2026Last changed in the dataset 24 January 2020

Technology
Solar
Capacity
23 MW
Status
Operational
Operator or applicant
Warrington Borough Council / Statkraft
Location
Land Parcel East Of, Wilpit Lane, Preston, Cirencester, Gloucestershire, GL7 5, United Kingdom
Planning authority
Cotswold
Planning application
15/01923/FUL
First operating
2022

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 8 May 2015 Planning application submitted
  • 17 September 2015 Planning permission granted
  • 6 September 2018 Construction started
  • 13 October 2022 Operational

Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.