Solar · United Kingdom
Cirencester Solar Farm
Operational23 MWChecked 6 October 2026Last changed in the dataset 24 January 2020
The site
- Technology
- Solar
- Capacity
- 23 MW
- Status
- Operational
- Operator or applicant
- Warrington Borough Council / Statkraft
- Location
- Land Parcel East Of, Wilpit Lane, Preston, Cirencester, Gloucestershire, GL7 5, United Kingdom
- Planning authority
- Cotswold
- Planning application
- 15/01923/FUL
- First operating
- 2022
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Timeline
- 8 May 2015 Planning application submitted
- 17 September 2015 Planning permission granted
- 6 September 2018 Construction started
- 13 October 2022 Operational
Incidents on the register at this site
Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.
Follow Cirencester Solar Farm
Get one email when this site's status changes in the Renewable Energy Planning Database (UK government), or when the register publishes an incident that names it. Free, no account needed, unsubscribe in one click.
By following you agree to the privacy policy.
Incidents at solar farms in the United Kingdom
The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.
- Fire involving solar panels at a Market Harborough house spreads to an adjoining property
- Solar inverter fire on agricultural building in Shropshire
- Fire damages solar panel batteries in a Teignmouth garage
- Fire damages roof with one solar panel in The Charltons
- Solar panels on flat roof alight at terraced building in Newquay
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.