Solar · United Kingdom
Cirencester Solar Farm
Operator Warrington Borough Council & Statkraft
Operational23 MWData checked 16 November 2026Source record dated 24 January 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Cirencester Solar Farm is a 23 MW solar farm 3.6 km east of Cirencester, Gloucestershire, United Kingdom. Its planning application (15/01923/FUL) went to Cotswold on 8 May 2015 and was granted on 17 September 2015. It has been operating since 13 October 2022. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 17 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds one incident at this site, the latest in 2025.
Incidents on the register at this site
In March 2025, in the mid afternoon, a fire was reported at the Cirencester Hybrid Solar Farm, a hybrid site on Witpit Lane, Preston, near Cirencester, Gloucestershire, United Kingdom, operated by Gridserve, combining ground mounted solar generation with a...
Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.
Get an email when Cirencester Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 23 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Warrington Borough Council & Statkraft
- Location
- Land Parcel East Of, Wilpit Lane, Preston, Cirencester, Gloucestershire, GL7 5, United Kingdom
- Planning authority
- Cotswold
- Planning application
- 15/01923/FUL
- First operating
- 2022
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 15/01923/FUL, with what the planning evidence pack adds for this site.
Every application in Cotswold · Alerts for applications and incidents near here
Timeline
- 8 May 2015 Planning application submitted
- 17 September 2015 Planning permission granted
- 6 September 2018 Construction started
- 13 October 2022 Operational
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Cirencester Solar Farm had a fire or other incident?
- Yes. The register holds one incident that names it: Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire (EIR-0058, 2025).
- What is the status of Cirencester Solar Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 24 January 2020.
- Where is Cirencester Solar Farm?
- 3.6 km east of Cirencester, Gloucestershire, United Kingdom (postcode GL7 5).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).