Solar · United Kingdom

Cirencester Solar Farm

Operator Warrington Borough Council & Statkraft

Operational23 MWData checked 16 November 2026Source record dated 24 January 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Cirencester Solar Farm is a 23 MW solar farm 3.6 km east of Cirencester, Gloucestershire, United Kingdom. Its planning application (15/01923/FUL) went to Cotswold on 8 May 2015 and was granted on 17 September 2015. It has been operating since 13 October 2022. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 17 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds one incident at this site, the latest in 2025.

Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.

The cause, the 1 linked record and the operator's 1 other site for Cirencester Solar Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
23 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Warrington Borough Council & Statkraft
Location
Land Parcel East Of, Wilpit Lane, Preston, Cirencester, Gloucestershire, GL7 5, United Kingdom
Planning authority
Cotswold
Planning application
15/01923/FUL
First operating
2022

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/01923/FUL, with what the planning evidence pack adds for this site.

Every application in Cotswold · Alerts for applications and incidents near here

  • 8 May 2015 Planning application submitted
  • 17 September 2015 Planning permission granted
  • 6 September 2018 Construction started
  • 13 October 2022 Operational

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Cirencester Solar Farm had a fire or other incident?
Yes. The register holds one incident that names it: Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire (EIR-0058, 2025).
What is the status of Cirencester Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 24 January 2020.
Where is Cirencester Solar Farm?
3.6 km east of Cirencester, Gloucestershire, United Kingdom (postcode GL7 5).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).