Solar · United Kingdom
Normandy Barracks
Operator Ministry of Defence
Under Construction2.3 MWData checked 16 November 2026Source record dated 29 April 2021
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Normandy Barracks is a 2.3 MW solar farm 3.5 km north of Beverley, Humberside, United Kingdom. Its planning application went to East Riding of Yorkshire. Construction started on 1 March 2021. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 25 other energy sites within 10 km, 11 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Normandy Barracks changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Normandy Barracks sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1175, Rooftop solar panel fire guts NHS mental health ward in Malton, 38 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1175 | 2026 | Rooftop solar panel fire guts NHS mental health ward in Malton | 38 km | Significant |
| EIR-1552 | 2023 | Fire starts in solar panels on commercial roof in Doncaster | 57 km | Significant |
| EIR-2771 | 2024 | Fire involves rooftop solar panels and lithium batteries on Bradford house roof | 86 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 2.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Ministry of Defence
- Location
- Defence School Of Transport, Normandy Barracks, Leconfield, Grange Road, Beverley, Humberside, Humberside, HU17 7LX, United Kingdom
- Planning authority
- East Riding of Yorkshire
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in East Riding of Yorkshire · Alerts for applications and incidents near here
Timeline
- 1 March 2021 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Normandy Barracks. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Normandy Barracks had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Normandy Barracks; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Normandy Barracks?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 29 April 2021.
- Where is Normandy Barracks?
- 3.5 km north of Beverley, Humberside, United Kingdom (postcode HU17 7LX).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).