Solar · United Kingdom
Wastewater Treatment Works, Fraserburgh
Operator Scottish Water
Under Construction1 MWData checked 16 November 2026Source record dated 12 January 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Wastewater Treatment Works, Fraserburgh is a 1 MW solar farm on the edge of Fraserburgh, Aberdeenshire, United Kingdom. Its planning application (APP/2020/1636) went to Aberdeenshire on 28 September 2020 and was granted on 15 December 2020. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 20 other energy sites within 10 km, 7 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Wastewater Treatment Works, Fraserburgh changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
SCOTTISH WATER LIMITED (SC207004), active, since 2000. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wastewater Treatment Works, Fraserburgh sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1476, House fire reported to have started on solar panels in Carnoustie, 138 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1476 | 2026 | House fire reported to have started on solar panels in Carnoustie | 138 km | Significant |
| EIR-1238 | 2019 | Leak from solar heating system at Carnegie Leisure Centre Dunfermline | 200 km | Minor |
| EIR-2016 | 2022 | Solar panel fire evacuates Hawick High School | 256 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Scottish Water
- Location
- Waste Water Treatment Works At Phingask Fraserburgh, Aberdeenshire, AB43 7BL, United Kingdom
- Planning authority
- Aberdeenshire
- Planning application
- APP/2020/1636
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for APP/2020/1636, with what the planning evidence pack adds for this site.
Every application in Aberdeenshire · Alerts for applications and incidents near here
Timeline
- 15 December 2018 Planning permission expired
- 28 September 2020 Planning application submitted
- 15 December 2020 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Wastewater Treatment Works, Fraserburgh. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Wastewater Treatment Works, Fraserburgh had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Wastewater Treatment Works, Fraserburgh; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Wastewater Treatment Works, Fraserburgh?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 January 2022.
- Where is Wastewater Treatment Works, Fraserburgh?
- On the edge of Fraserburgh, Aberdeenshire, United Kingdom (postcode AB43 7BL).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).