Solar · United Kingdom
Waste Water Treatment Works, Almondbank - Pumping Station & Solar Panels
Operator Scottish Water
Awaiting ConstructionData checked 16 November 2026Source record dated 6 October 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Waste Water Treatment Works, Almondbank - Pumping Station & Solar Panels is a solar farm 5.2 km north-west of Perth, United Kingdom. Its planning application (23/01136/FLL) went to Perth and Kinross on 9 August 2023 and was granted on 4 October 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 21 other energy sites within 10 km, 8 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Waste Water Treatment Works, Almondbank - Pumping Station & Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
SCOTTISH WATER LIMITED (SC207004), active, since 2000. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Waste Water Treatment Works, Almondbank - Pumping Station & Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1238, Leak from solar heating system at Carnegie Leisure Centre Dunfermline, 38 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1238 | 2019 | Leak from solar heating system at Carnegie Leisure Centre Dunfermline | 38 km | Minor |
| EIR-1476 | 2026 | House fire reported to have started on solar panels in Carnoustie | 50 km | Significant |
| EIR-2016 | 2022 | Solar panel fire evacuates Hawick High School | 119 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Scottish Water
- Location
- Almondbank, Perth, Perth and Kinross, PH1 3JX, United Kingdom
- Planning authority
- Perth and Kinross
- Planning application
- 23/01136/FLL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/01136/FLL, with what the planning evidence pack adds for this site.
Every application in Perth and Kinross · Alerts for applications and incidents near here
Timeline
- 9 August 2023 Planning application submitted
- 4 October 2023 Planning permission granted
- 4 October 2026 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Waste Water Treatment Works, Almondbank - Pumping Station & Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Waste Water Treatment Works, Almondbank - Pumping Station & Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Waste Water Treatment Works, Almondbank - Pumping Station & Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Waste Water Treatment Works, Almondbank - Pumping Station & Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 6 October 2023.
- Where is Waste Water Treatment Works, Almondbank - Pumping Station & Solar Panels?
- 5.2 km north-west of Perth, United Kingdom (postcode PH1 3JX).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).