Solar · United Kingdom

Washdyke Farm, Billingborough Road - Solar farm

Operator GS Ignis Limited

Awaiting Construction27 MWData checked 16 November 2026Source record dated 23 February 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Washdyke Farm, Billingborough Road - Solar farm is a 27 MW solar farm 12 km south of Sleaford, Lincolnshire, United Kingdom. Its planning application (S23/0511) went to South Kesteven on 27 March 2023 and was granted on appeal on 23 April 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 7 other energy sites within 10 km, 6 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Washdyke Farm, Billingborough Road - Solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0764, Transformer smoking at solar farm in Burton Pedwardine, 9.1 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine9.1 kmMinor
EIR-12652024Solar panels catch fire and destroy three buildings in Harby34 kmSignificant
EIR-11552024Rooftop solar fire contained on a Peterborough warehouse roof37 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
27 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
GS Ignis Limited
Location
Washdyke Farm, Billingborough Road, Folkingham, Sleaford, Lincolnshire, NG34 0EZ, United Kingdom
Planning authority
South Kesteven
Planning application
S23/0511
Appeal reference
APP/E2530/W/24/3337544

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S23/0511, with what the planning evidence pack adds for this site.

Every application in South Kesteven · Alerts for applications and incidents near here

  • 27 March 2023 Planning application submitted
  • 28 July 2023 Planning permission refused
  • 23 April 2024 Planning permission granted
  • 23 April 2024 Appeal granted
  • 23 April 2024 Appeal refused
  • 23 April 2027 Planning permission runs out

None found. The register holds no published incident that names Washdyke Farm, Billingborough Road - Solar farm. If you know of one, report it (confidential reports are anonymised).

Has Washdyke Farm, Billingborough Road - Solar farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Washdyke Farm, Billingborough Road - Solar farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Washdyke Farm, Billingborough Road - Solar farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 February 2026.
Where is Washdyke Farm, Billingborough Road - Solar farm?
12 km south of Sleaford, Lincolnshire, United Kingdom (postcode NG34 0EZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).