← Back to Surrey

Solar · United Kingdom

Walton WTW PV

Operator Thames Water Utilities · Owner Kemble Water Finance Limited

Operational1.8 MWData checked 18 November 2026Source record dated 8 October 2013

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Walton WTW PV is a 1.8 MW solar farm in West Molesey, Surrey, United Kingdom. Its planning application went to Elmbridge. It has been operating since 30 July 2011. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 72 other energy sites within 10 km, 47 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 3 other sites and 806 energy sites within 40 km for Walton WTW PV

Members see the sites and incidents around this one, and every record behind them.

THAMES WATER UTILITIES LIMITED (02366661), active, since 1989. 7 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
1.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Thames Water Utilities
Owner
Kemble Water Finance Limited
Location
Walton Water Treatment Works, Hurst Road, Walton On Thames, Surrey, United Kingdom
Planning authority
Elmbridge
First operating
2011

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in Elmbridge · Alerts for applications and incidents near here

  • 30 July 2011 Operational

None found. The register holds no published incident that names Walton WTW PV. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Walton WTW PV had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Walton WTW PV; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Walton WTW PV?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 8 October 2013.
Where is Walton WTW PV?
In West Molesey, Surrey, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).