Onshore wind · United Kingdom
Beckton Sewage Treatment Works
Operator Thames Water Utilities · Owner Kemble Water Finance Limited
Operational2.2 MWData checked 18 November 2026Source record dated 10 February 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Beckton Sewage Treatment Works is a 2.2 MW wind farm in Barking, London, United Kingdom. Its planning application went to Newham. It has been operating since 12 November 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 118 other energy sites within 10 km, 6 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Beckton Sewage Treatment Works changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
THAMES WATER UTILITIES LIMITED (02366661), active, since 1989. 7 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 2.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Thames Water Utilities
- Owner
- Kemble Water Finance Limited
- Location
- Beckton Sewage Works, Jenkins Lane, Barking, London, IG11 0AD, United Kingdom
- Planning authority
- Newham
- First operating
- 2014
- Turbines
- 2, 64 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in Newham · Alerts for applications and incidents near here
Timeline
- 12 November 2014 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Beckton Sewage Treatment Works. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Beckton Sewage Treatment Works had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Beckton Sewage Treatment Works; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Beckton Sewage Treatment Works?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 10 February 2015.
- Where is Beckton Sewage Treatment Works?
- In Barking, London, United Kingdom (postcode IG11 0AD).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).