Solar · United Kingdom
Hurst Road - Walton Solar PV Farm
Operator Affinity Water Limited
Operational0.6 MWData checked 16 November 2026Source record dated 17 November 2021
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Hurst Road - Walton Solar PV Farm is a 0.6 MW solar farm in West Molesey, Surrey, United Kingdom. Its planning application went to Elmbridge and was granted on 4 January 2023. It has been operating since 1 April 2022. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 71 other energy sites within 10 km, 46 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Hurst Road - Walton Solar PV Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 0.6 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Affinity Water Limited
- Location
- Walton Solar PV Farm, Walton Water Treatment Works, Hurst Road, Walton on Thames, Surrey, KT12 2EG, United Kingdom
- Planning authority
- Elmbridge
- First operating
- 2022
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in Elmbridge · Alerts for applications and incidents near here
Timeline
- 1 October 2021 Construction started
- 1 April 2022 Operational
- 4 January 2023 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Hurst Road - Walton Solar PV Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Hurst Road - Walton Solar PV Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hurst Road - Walton Solar PV Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Hurst Road - Walton Solar PV Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 17 November 2021.
- Where is Hurst Road - Walton Solar PV Farm?
- In West Molesey, Surrey, United Kingdom (postcode KT12 2EG).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).