← Back to Suffolk
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Wales End Road, Cavendish - Battery Energy Storage System

Operator Noventum Power Limited · Owner O.Y. Nofar Energy Limited

Application Submitted10 MWData checked 16 November 2026Source record dated 22 August 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Wales End Road, Cavendish - Battery Energy Storage System is a 10 MW battery storage site 11 km north-west of Sudbury, Suffolk, United Kingdom. Its planning application (DC/25/1027/FUL) went to West Suffolk on 14 July 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 8 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

NOVENTUM POWER LIMITED (13731615), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wales End Road, Cavendish - Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 71 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction71 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells162 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire180 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Noventum Power Limited
Owner
O.Y. Nofar Energy Limited
Location
N/O Wales End Road, Cavendish, Sudbury, Suffolk, CO10 8DE, United Kingdom
Planning authority
West Suffolk
Planning application
DC/25/1027/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DC/25/1027/FUL, with what the planning evidence pack adds for this site.

Every application in West Suffolk · Alerts for applications and incidents near here

  • 14 July 2025 Planning application submitted

None found. The register holds no published incident that names Wales End Road, Cavendish - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has Wales End Road, Cavendish - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wales End Road, Cavendish - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Wales End Road, Cavendish - Battery Energy Storage System?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 22 August 2025.
Where is Wales End Road, Cavendish - Battery Energy Storage System?
11 km north-west of Sudbury, Suffolk, United Kingdom (postcode CO10 8DE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).