Pentlow Hill is a 24 MW solar farm 6.4 km north-west of Sudbury, Essex, United Kingdom. Its planning application (20/01107/FUL) went to Braintree on 10 July 2020 and was granted on 23 April 2021. It has been operating since 10 June 2024. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 13 other energy sites within 10 km, 6 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Pentlow Hill changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 24 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Nextpower SPV 11 Limited
- Location
- Land East Of, Pentlow Street, Pentlow, Sudbury, Suffolk, Essex, CO10 7JJ, United Kingdom
- Planning authority
- Braintree
- Planning application
- 20/01107/FUL
- First operating
- 2024
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 20/01107/FUL, with what the planning evidence pack adds for this site.
Every application in Braintree · Alerts for applications and incidents near here
Timeline
- 10 July 2020 Planning application submitted
- 23 April 2021 Planning permission granted
- 10 June 2024 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Pentlow Hill. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Pentlow Hill had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Pentlow Hill; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Pentlow Hill?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 July 2024.
- Where is Pentlow Hill?
- 6.4 km north-west of Sudbury, Essex, United Kingdom (postcode CO10 7JJ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).