Twitch Hill, Cheswell Grange Farm - Solar Farm & Battery Storage

Operator Ethical Power

Under Construction25 MWData checked 16 November 2026Source record dated 1 July 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Twitch Hill, Cheswell Grange Farm - Solar Farm & Battery Storage is a 25 MW solar farm 4.2 km south-west of Newport, Shropshire, United Kingdom. Its planning application (TWC/2021/1225) went to Telford and Wrekin on 22 December 2021 and was granted on 29 June 2022. Construction started on 1 June 2024. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 40 other energy sites within 10 km, 25 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

ETHICAL POWER LTD (15872540), active, since 2024. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Twitch Hill, Cheswell Grange Farm - Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 79 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool79 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells97 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire119 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
25 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Ethical Power
Location
Cheswell Grange Farm, Cheswell Drive, Cheswell, Newport, Shropshire, TF10 9AE, United Kingdom
Planning authority
Telford and Wrekin
Planning application
TWC/2021/1225

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for TWC/2021/1225, with what the planning evidence pack adds for this site.

Every application in Telford and Wrekin · Alerts for applications and incidents near here

  • 22 December 2021 Planning application submitted
  • 29 June 2022 Planning permission granted
  • 1 June 2024 Construction started

None found. The register holds no published incident that names Twitch Hill, Cheswell Grange Farm - Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Twitch Hill, Cheswell Grange Farm - Solar Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Twitch Hill, Cheswell Grange Farm - Solar Farm & Battery Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Twitch Hill, Cheswell Grange Farm - Solar Farm & Battery Storage?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 July 2024.
Where is Twitch Hill, Cheswell Grange Farm - Solar Farm & Battery Storage?
4.2 km south-west of Newport, Shropshire, United Kingdom (postcode TF10 9AE).