Solar · United Kingdom

Branston Solar Park (extension)

Operator Ethical Power

Under Construction40 MWData checked 16 November 2026Source record dated 26 November 2019

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Branston Solar Park (extension) is a 40 MW solar farm 3.2 km south of Heighington, Lincolnshire, United Kingdom. Its planning application (17/1546/FUL) went to North Kesteven on 23 October 2017 and was granted on 19 December 2017. Construction started on 30 September 2019. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 20 other energy sites within 10 km, 11 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

ETHICAL POWER LTD (15872540), active, since 2024. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Branston Solar Park (extension) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0764, Transformer smoking at solar farm in Burton Pedwardine, 26 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine26 kmMinor
EIR-12652024Solar panels catch fire and destroy three buildings in Harby45 kmSignificant
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster48 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
40 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Ethical Power
Location
Land Between, Mere Road and Sleaford Road, Branston, Lincoln, Lincolnshire, Lincolnshire, LN4 1NJ, United Kingdom
Planning authority
North Kesteven
Planning application
17/1546/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 17/1546/FUL, with what the planning evidence pack adds for this site.

Every application in North Kesteven · Alerts for applications and incidents near here

  • 23 October 2017 Planning application submitted
  • 19 December 2017 Planning permission granted
  • 30 September 2019 Construction started

None found. The register holds no published incident that names Branston Solar Park (extension). If you know of one, report it (confidential reports are anonymised).

Has Branston Solar Park (extension) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Branston Solar Park (extension); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Branston Solar Park (extension)?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 November 2019.
Where is Branston Solar Park (extension)?
3.2 km south of Heighington, Lincolnshire, United Kingdom (postcode LN4 1NJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).