← Back to Lincolnshire

Energy sites / United Kingdom / Lincolnshire

Solar · United Kingdom

Kirton Solar PV Farm

Operational3.2 MWChecked 6 October 2026Last changed in the dataset 28 July 2016

Technology
Solar
Capacity
3.2 MW
Status
Operational
Operator or applicant
Ethical Power
Location
Land off Meeres Lane and adjacent to Pick's Barn, Kirton, Boston, Lincolnshire, PE20 1PR, United Kingdom
Planning authority
Boston
Planning application
B/15/0001
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 28 November 2014 Planning application submitted
  • 7 May 2015 Planning permission granted
  • 2 February 2016 Construction started
  • 30 March 2016 Operational

None found. The register holds no published incident that names Kirton Solar PV Farm. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.