Solar · United Kingdom
Tump Solar Farm
Operator Green Energy UK Direct
Operational5 MWData checked 16 November 2026Source record dated 31 May 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Tump Solar Farm is a 5 MW solar farm on the edge of Chepstow, Gloucestershire, United Kingdom. Its planning application (P0578/15/FUL) went to Forest of Dean on 7 May 2015 and was granted on 14 August 2015. It has been operating since 8 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 15 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Tump Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
GREEN ENERGY UK DIRECT LIMITED (07384535), dissolved, since 2010. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Solar
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Green Energy UK Direct
- Location
- Tump Farm, Sedbury Lane, Sedbury, Chepstow, Gwent, Gloucestershire, NP16 7HN, United Kingdom
- Planning authority
- Forest of Dean
- Planning application
- P0578/15/FUL
- First operating
- 2017
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P0578/15/FUL, with what the planning evidence pack adds for this site.
Every application in Forest of Dean · Alerts for applications and incidents near here
Timeline
- 7 May 2015 Planning application submitted
- 14 August 2015 Planning permission granted
- 8 January 2017 Construction started
- 8 March 2017 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Tump Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Tump Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Tump Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Tump Solar Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 31 May 2017.
- Where is Tump Solar Farm?
- On the edge of Chepstow, Gloucestershire, United Kingdom (postcode NP16 7HN).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).