Solar · United Kingdom
Treoes - Solar Farm
Operator Windel Solar 9 Limited
Awaiting ConstructionData checked 16 November 2026Source record dated 2 December 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Treoes - Solar Farm is a solar farm 3.5 km south of Pencoed, Vale of Glamorgan, United Kingdom. Its planning application (2024/01020/FUL) went to Vale of Glamorgan on 30 October 2024 and was granted on 10 October 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 37 other energy sites within 10 km, 24 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Treoes - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Treoes - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1453, Fire crews tackle solar panel unit blaze in Burnham-On-Sea, 46 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1453 | 2026 | Fire crews tackle solar panel unit blaze in Burnham-On-Sea | 46 km | Minor |
| EIR-1416 | 2025 | Fire at Bristol hospital started in solar panels | 63 km | Significant |
| EIR-1274 | 2022 | Fire damages rooftop solar panels at We The Curious in Bristol | 63 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Windel Solar 9 Limited
- Location
- E/O Treoes, Bridgend, Vale of Glamorgan, CF35 5DS, United Kingdom
- Planning authority
- Vale of Glamorgan
- Planning application
- 2024/01020/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2024/01020/FUL, with what the planning evidence pack adds for this site.
Every application in Vale of Glamorgan · Alerts for applications and incidents near here
Timeline
- 30 October 2024 Planning application submitted
- 10 October 2025 Planning permission granted
- 10 October 2030 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Treoes - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Treoes - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Treoes - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Treoes - Solar Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2025.
- Where is Treoes - Solar Farm?
- 3.5 km south of Pencoed, Vale of Glamorgan, United Kingdom (postcode CF35 5DS).