Solar · United Kingdom

SAS International, Unit 1 - Solar PV Panels

Operator SAS International Limited

Under Construction0.8 MWData checked 16 November 2026Source record dated 31 May 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

SAS International, Unit 1 - Solar PV Panels is a 0.8 MW solar farm 3.4 km east of Bridgend, Mid Glamorgan, United Kingdom. Its planning application (P/21/765/FUL) went to Bridgend on 20 August 2021 and was granted on 25 October 2021. Construction started on 1 May 2022. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 27 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for SAS International, Unit 1 - Solar PV Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1453, Fire crews tackle solar panel unit blaze in Burnham-On-Sea, 48 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14532026Fire crews tackle solar panel unit blaze in Burnham-On-Sea48 kmMinor
EIR-14162025Fire at Bristol hospital started in solar panels66 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol66 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
SAS International Limited
Location
SAS International Parc Crescent Waterton Industrial Estate, Bridgend, Mid Glamorgan, CF31 3XU, United Kingdom
Planning authority
Bridgend
Planning application
P/21/765/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/21/765/FUL, with what the planning evidence pack adds for this site.

Every application in Bridgend · Alerts for applications and incidents near here

  • 20 August 2021 Planning application submitted
  • 25 October 2021 Planning permission granted
  • 1 May 2022 Construction started

None found. The register holds no published incident that names SAS International, Unit 1 - Solar PV Panels. If you know of one, report it (confidential reports are anonymised).

Has SAS International, Unit 1 - Solar PV Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names SAS International, Unit 1 - Solar PV Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of SAS International, Unit 1 - Solar PV Panels?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 31 May 2022.
Where is SAS International, Unit 1 - Solar PV Panels?
3.4 km east of Bridgend, Mid Glamorgan, United Kingdom (postcode CF31 3XU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).