Solar · United Kingdom
Tredown Solar Farm
Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited
Operational1.2 MWData checked 16 November 2026Source record dated 17 February 2014
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Tredown Solar Farm is a 1.2 MW solar farm 7 km south-east of Launceston, Devon, United Kingdom. Its planning application (02517/2012) went to West Devon on 28 March 2012 and was granted on 28 March 2013. It has been operating since 27 August 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 5 other energy sites within 10 km, 3 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Tredown Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Solar
- Capacity
- 1.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Lightsource Renewable Energy
- Owner
- Lightsource Holdings 3 Limited
- Location
- Land to S/E of Kelly Cross SX398815 (part of Tredown Farm) Meadwell, Kelly, Devon, Devon, United Kingdom
- Planning authority
- West Devon
- Planning application
- 02517/2012
- First operating
- 2013
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 02517/2012, with what the planning evidence pack adds for this site.
Every application in West Devon · Alerts for applications and incidents near here
Timeline
- 28 March 2012 Planning application submitted
- 28 March 2013 Planning permission granted
- 27 August 2013 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Tredown Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Tredown Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Tredown Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Tredown Solar Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 17 February 2014.
- Where is Tredown Solar Farm?
- 7 km south-east of Launceston, Devon, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).