← Back to Cornwall
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Link Road - Battery Storage

Operator Aldustria Energy Storage · Owner Gridbeyond Limited

Awaiting Construction3 MWData checked 16 November 2026Source record dated 30 March 2023

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Link Road - Battery Storage is a 3 MW battery storage site in Launceston, Cornwall, United Kingdom. Its planning application (PA22/06503) went to Cornwall on 2 September 2022 and was granted on 1 November 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 8 other energy sites within 10 km. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

GRIDBEYOND LIMITED (08211691), active, since 2012. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Link Road - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0249, Smoke and fire incident at Battery Box, Pinhoe Road, Exeter, 64 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter64 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire208 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool323 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Aldustria Energy Storage
Owner
Gridbeyond Limited
Location
South Of Link Road, Cornwall, PL15 9LP, United Kingdom
Planning authority
Cornwall
Planning application
PA22/06503

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA22/06503, with what the planning evidence pack adds for this site.

Every application in Cornwall · Alerts for applications and incidents near here

  • 2 September 2022 Planning application submitted
  • 1 November 2022 Planning permission granted
  • 1 November 2025 Planning permission expired

None found. The register holds no published incident that names Link Road - Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Link Road - Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Link Road - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Link Road - Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 30 March 2023.
Where is Link Road - Battery Storage?
In Launceston, Cornwall, United Kingdom (postcode PL15 9LP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).