Battery storage · United Kingdom

Mount Stamper Road, Treverbyn - Battery Energy Storage

Operator Aldustria Energy Storage

Awaiting Construction10 MWData checked 16 November 2026Source record dated 15 July 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Mount Stamper Road, Treverbyn - Battery Energy Storage is a 10 MW battery storage site on the edge of St Austell, Cornwall, United Kingdom. Its planning application (PA24/01713) went to Cornwall on 23 April 2024 and was granted on 17 June 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 49 other energy sites within 10 km, 14 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Mount Stamper Road, Treverbyn - Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0249, Smoke and fire incident at Battery Box, Pinhoe Road, Exeter, 102 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter102 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire251 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool361 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Aldustria Energy Storage
Location
Mount Stamper Road, Treverbyn, St Austell, Cornwall, PL25 5RX, United Kingdom
Planning authority
Cornwall
Planning application
PA24/01713

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA24/01713, with what the planning evidence pack adds for this site.

Every application in Cornwall · Alerts for applications and incidents near here

  • 23 April 2024 Planning application submitted
  • 17 June 2024 Planning permission granted

None found. The register holds no published incident that names Mount Stamper Road, Treverbyn - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Mount Stamper Road, Treverbyn - Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mount Stamper Road, Treverbyn - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Mount Stamper Road, Treverbyn - Battery Energy Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 15 July 2025.
Where is Mount Stamper Road, Treverbyn - Battery Energy Storage?
On the edge of St Austell, Cornwall, United Kingdom (postcode PL25 5RX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).