Battery storage · United Kingdom

Menear Road - Solar & Battery storage

Operator Anesco Limited · Owner Quanesco Midco Limited

Awaiting Construction5 MWData checked 16 November 2026Source record dated 8 April 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Menear Road - Solar & Battery storage is a 5 MW battery storage site on the edge of St Austell, Cornwall, United Kingdom. Its planning application (PA23/09532) went to Cornwall on 5 March 2024 and was granted on appeal on 13 February 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 37 other energy sites within 10 km, 8 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

ANESCO LIMITED (07443091), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Menear Road - Solar & Battery storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0249, Smoke and fire incident at Battery Box, Pinhoe Road, Exeter, 100 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter100 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire249 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool361 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Anesco Limited
Owner
Quanesco Midco Limited
Location
E/O Menear Farm Menear Road St Austell, Cornwall, PL25 3JT, United Kingdom
Planning authority
Cornwall
Planning application
PA23/09532

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA23/09532, with what the planning evidence pack adds for this site.

Every application in Cornwall · Alerts for applications and incidents near here

  • 5 March 2024 Planning application submitted
  • 23 April 2025 Planning permission refused
  • 4 November 2025 Appeal lodged
  • 13 February 2026 Planning permission granted
  • 13 February 2026 Appeal granted
  • 13 February 2031 Planning permission runs out

None found. The register holds no published incident that names Menear Road - Solar & Battery storage. If you know of one, report it (confidential reports are anonymised).

Has Menear Road - Solar & Battery storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Menear Road - Solar & Battery storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Menear Road - Solar & Battery storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 April 2026.
Where is Menear Road - Solar & Battery storage?
On the edge of St Austell, Cornwall, United Kingdom (postcode PL25 3JT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).