Battery storage · United Kingdom

Chosen Park, Baglan Energy Park - Unit 3 - Battery Storage System

Operator Aldustria Energy Storage · Owner Pulse Clean Energy UK Limited

Operational30 MWData checked 16 November 2026Source record dated 8 July 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Chosen Park, Baglan Energy Park - Unit 3 - Battery Storage System is a 30 MW battery storage site in Briton Ferry, West Glamorgan, United Kingdom. Its planning application (P2025/0064) went to Neath Port Talbot on 25 February 2025 and was granted on 19 June 2025. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 42 other energy sites within 10 km, 13 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 4 other sites and 283 energy sites within 40 km for Chosen Park, Baglan Energy Park - Unit 3 - Battery…

Members see the sites and incidents around this one, and every record behind them.

21 Oct5 Nov
Dynamic ContainmentDynamic ModerationDynamic Regulation

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

A day out costs this site about £729 at its earnings over the last 7 settled days (response and reserve auctions). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

PULSE CLEAN ENERGY UK LIMITED (07609301), active, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
30 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational (Planning Permission Granted)
Operator or applicant
Aldustria Energy Storage
Owner
Pulse Clean Energy UK Limited
Location
Unit 3, Chosen Park, Lane From Brunel Way To Sewage Pumping Station, Baglan Energy Park, Neath, West Glamorgan, SA11 2HZ, United Kingdom
Planning authority
Neath Port Talbot
Planning application
P2025/0064

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P2025/0064, with what the planning evidence pack adds for this site.

Every application in Neath Port Talbot · Alerts for applications and incidents near here

  • 25 February 2025 Planning application submitted
  • 19 June 2025 Planning permission granted
  • 18 June 2030 Planning permission runs out

None found. The register holds no published incident that names Chosen Park, Baglan Energy Park - Unit 3 - Battery Storage System. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Chosen Park, Baglan Energy Park - Unit 3 - Battery Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Chosen Park, Baglan Energy Park - Unit 3 - Battery Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Chosen Park, Baglan Energy Park - Unit 3 - Battery Storage System?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 8 July 2025.
Where is Chosen Park, Baglan Energy Park - Unit 3 - Battery Storage System?
In Briton Ferry, West Glamorgan, United Kingdom (postcode SA11 2HZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).