Solar · United Kingdom

Baglan Bay Solar Farm - Phase 2

Operator St. Modwen Developments

Application Withdrawn10 MWData checked 16 November 2026Source record dated 31 March 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Baglan Bay Solar Farm - Phase 2 is a 10 MW solar farm in Briton Ferry, Neath Port Talbot, United Kingdom. Its planning application (P2015/0304) went to Neath Port Talbot on 6 May 2015 and was withdrawn on 11 March 2020. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 42 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 1 other site and 284 energy sites within 40 km for Baglan Bay Solar Farm - Phase 2

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
St. Modwen Developments
Location
Land adjacent to, Central Aven, Baglan Energy Park, Baglan, Phase 1, Port Talbot, West Glamorgan, Neath Port Talbot, SA12 7AX, United Kingdom
Planning authority
Neath Port Talbot
Planning application
P2015/0304

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P2015/0304, with what the planning evidence pack adds for this site.

Every application in Neath Port Talbot · Alerts for applications and incidents near here

  • 6 May 2015 Planning application submitted
  • 11 March 2020 Application withdrawn

None found. The register holds no published incident that names Baglan Bay Solar Farm - Phase 2. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Baglan Bay Solar Farm - Phase 2 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Baglan Bay Solar Farm - Phase 2; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Baglan Bay Solar Farm - Phase 2?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 31 March 2020.
Where is Baglan Bay Solar Farm - Phase 2?
In Briton Ferry, Neath Port Talbot, United Kingdom (postcode SA12 7AX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).