Tiddiecross Solar Farm

Operator Vogt Solar

Operational10.5 MWData checked 16 November 2026Source record dated 10 May 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Tiddiecross Solar Farm is a 10.5 MW solar farm 3.9 km west of Wellington, Shropshire, United Kingdom. Its planning application (TWC/2014/0810) went to Telford and Wrekin on 10 September 2014 and was granted on 7 January 2015. It has been operating since 31 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 45 other energy sites within 10 km, 25 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 11 other sites and 309 energy sites within 40 km for Tiddiecross Solar Farm

Members see the sites and incidents around this one, and every record behind them.

FIRMA VOGT SOLAR LIMITED (13979492), active, since 2022. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
10.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Vogt Solar
Location
Land adjacent to Tiddiecross, Charlton, Telford, Shropshire, TF6 5EY, United Kingdom
Planning authority
Telford and Wrekin
Planning application
TWC/2014/0810
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for TWC/2014/0810, with what the planning evidence pack adds for this site.

Every application in Telford and Wrekin · Alerts for applications and incidents near here

  • 10 September 2014 Planning application submitted
  • 7 January 2015 Planning permission granted
  • 8 January 2015 Construction started
  • 31 March 2015 Operational

None found. The register holds no published incident that names Tiddiecross Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Tiddiecross Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tiddiecross Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Tiddiecross Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 10 May 2016.
Where is Tiddiecross Solar Farm?
3.9 km west of Wellington, Shropshire, United Kingdom (postcode TF6 5EY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).