Solar · United Kingdom
Steeraway Farm - Solar Farm
Operator Enviromena · Owner Solarmena LP
Under Construction30 MWData checked 16 November 2026Source record dated 26 January 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Steeraway Farm - Solar Farm is a 30 MW solar farm on the edge of Wellington, Shropshire, United Kingdom. Its planning application (TWC/2021/1071) went to Telford and Wrekin on 28 October 2021 and was granted on appeal on 9 May 2023. Construction started on 1 September 2025. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 52 other energy sites within 10 km, 31 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Steeraway Farm - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
ENVIROMENA LIMITED (14920168), active, since 2023. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Steeraway Farm - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0172, Fire at Wheat Leasows solar farm in Telford involves an electricity pylon, 4.6 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0172 | 2026 | Fire at Wheat Leasows solar farm in Telford involves an electricity pylon | 4.6 km | Minor |
| EIR-1547 | 2025 | Small fire within a solar panel at a house in Shropshire | 9.6 km | Minor |
| EIR-1550 | 2021 | Small fire involving solar panels at a property in Clun | 9.6 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 30 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Enviromena
- Owner
- Solarmena LP
- Location
- Steeraway Farm, Limekiln Lane, Wellington, Telford, Shropshire, TF1 2JU, United Kingdom
- Planning authority
- Telford and Wrekin
- Planning application
- TWC/2021/1071
- Appeal reference
- APP/C3240/W/22/3308481
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for TWC/2021/1071, with what the planning evidence pack adds for this site.
Every application in Telford and Wrekin · Alerts for applications and incidents near here
Timeline
- 28 October 2021 Planning application submitted
- 8 April 2022 Planning permission refused
- 18 October 2022 Appeal lodged
- 9 May 2023 Planning permission granted
- 9 May 2023 Appeal granted
- 1 September 2025 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Steeraway Farm - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Steeraway Farm - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Steeraway Farm - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Steeraway Farm - Solar Farm?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 January 2026.
- Where is Steeraway Farm - Solar Farm?
- On the edge of Wellington, Shropshire, United Kingdom (postcode TF1 2JU).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).