Solar · United Kingdom
Princess Royal Hospital, Grainger Drive - Solar PV Panels
Operator Shresbury and Telford Hospital NHS Trust
Awaiting Construction2.1 MWData checked 16 November 2026Source record dated 30 June 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Princess Royal Hospital, Grainger Drive - Solar PV Panels is a 2.1 MW solar farm in Wellington, Shropshire, United Kingdom. Its planning application (TWC/2026/0269) went to Telford and Wrekin on 13 April 2026 and was granted on 1 June 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 51 other energy sites within 10 km, 31 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Princess Royal Hospital, Grainger Drive - Solar PV Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Princess Royal Hospital, Grainger Drive - Solar PV Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0172, Fire at Wheat Leasows solar farm in Telford involves an electricity pylon, 2.9 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0172 | 2026 | Fire at Wheat Leasows solar farm in Telford involves an electricity pylon | 2.9 km | Minor |
| EIR-1547 | 2025 | Small fire within a solar panel at a house in Shropshire | 11 km | Minor |
| EIR-1550 | 2021 | Small fire involving solar panels at a property in Clun | 11 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 2.1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Shresbury and Telford Hospital NHS Trust
- Location
- Princess Royal Hospital, Grainger Drive, Apley, Shropshire, TF1 6TF, United Kingdom
- Planning authority
- Telford and Wrekin
- Planning application
- TWC/2026/0269
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for TWC/2026/0269, with what the planning evidence pack adds for this site.
Every application in Telford and Wrekin · Alerts for applications and incidents near here
Timeline
- 13 April 2026 Planning application submitted
- 1 June 2026 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Princess Royal Hospital, Grainger Drive - Solar PV Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Princess Royal Hospital, Grainger Drive - Solar PV Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Princess Royal Hospital, Grainger Drive - Solar PV Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Princess Royal Hospital, Grainger Drive - Solar PV Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 30 June 2026.
- Where is Princess Royal Hospital, Grainger Drive - Solar PV Panels?
- In Wellington, Shropshire, United Kingdom (postcode TF1 6TF).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).