Solar · United Kingdom
Wheat Leasows Solar Park
Operator Telford and Wrekin Borough Council
Operational4 MWData checked 16 November 2026Source record dated 6 January 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Wheat Leasows Solar Park is a 4 MW solar farm on the edge of Hadley, Shropshire, United Kingdom. Its planning application (TWC/2014/0134) went to Telford and Wrekin on 13 February 2014 and was granted on 8 May 2014. It has been operating since 1 December 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 53 other energy sites within 10 km, 32 of them solar farms (hybrid battery and solar sites included). The register holds one incident at this site, the latest in 2026.
Incidents on the register at this site
Firefighters were called to a blaze at Wheat Leasows solar farm in Hortonwood, Telford, reported at about 2pm on 23 August 2026. A fire service spokesperson said the incident involved grass, hedgerows, an electrical pylon and electrics which were on fire. Two...
Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.
Get an email when Wheat Leasows Solar Park changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Telford and Wrekin Borough Council
- Location
- Land at, Wheat Leasows, Telford, Shropshire, TF6 6DS, United Kingdom
- Planning authority
- Telford and Wrekin
- Planning application
- TWC/2014/0134
- First operating
- 2014
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for TWC/2014/0134, with what the planning evidence pack adds for this site.
Every application in Telford and Wrekin · Alerts for applications and incidents near here
Timeline
- 13 February 2014 Planning application submitted
- 8 May 2014 Planning permission granted
- 1 September 2014 Construction started
- 1 December 2014 Operational
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Wheat Leasows Solar Park had a fire or other incident?
- Yes. The register holds one incident that names it: Fire at Wheat Leasows solar farm in Telford involves an electricity pylon (EIR-0172, 2026).
- What is the status of Wheat Leasows Solar Park?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 6 January 2016.
- Where is Wheat Leasows Solar Park?
- On the edge of Hadley, Shropshire, United Kingdom (postcode TF6 6DS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).