← Back to Berkshire

Energy sites / United Kingdom / Berkshire

Solar · United Kingdom

The Paddock Centre, Joshua Jebb Way - Solar Panels

Awaiting Construction0.2 MWChecked 6 October 2026Last changed in the dataset 10 February 2025

Technology
Solar
Capacity
0.2 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
West London NHS Trust
Location
The Paddock Centre Broadmoor Hospital Joshua Jebb Way, Berkshire, RG45 7ET, United Kingdom
Planning authority
Bracknell Forest
Planning application
24/00795/PAS

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 12 December 2024 Planning application submitted
  • 29 January 2025 Planning permission granted

None found. The register holds no published incident that names The Paddock Centre, Joshua Jebb Way - Solar Panels. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack sets out every comparable incident for one project, with sources. £295, by email in minutes.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.