Solar · United Kingdom
David Lloyd Royal Berkshire - Solar Panels
Operator David Lloyd Leisure Limited
Awaiting ConstructionData checked 16 November 2026Source record dated 29 September 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
David Lloyd Royal Berkshire - Solar Panels is a solar farm on the edge of Bracknell, Berkshire, United Kingdom. Its planning application (25/00430/PAS) went to Bracknell Forest on 24 July 2025 and was granted on 2 September 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 30 other energy sites within 10 km, 20 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when David Lloyd Royal Berkshire - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
DAVID LLOYD LEISURE LIMITED (01516226), active, since 1980. 5 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for David Lloyd Royal Berkshire - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1531, Fire involving solar panels damages roof of flats in Fleet, 15 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1531 | 2022 | Fire involving solar panels damages roof of flats in Fleet | 15 km | Significant |
| EIR-1519 | 2025 | Solar panels involved in outbuilding roof fire in Bourne End | 22 km | Minor |
| EIR-2939 | 2026 | Rooftop solar fire forces West Drayton school to close early | 23 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- David Lloyd Leisure Limited
- Location
- David Lloyd, Nine Mile Ride, Bracknell, Berkshire, RG12 7PB, United Kingdom
- Planning authority
- Bracknell Forest
- Planning application
- 25/00430/PAS
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 25/00430/PAS, with what the planning evidence pack adds for this site.
Every application in Bracknell Forest · Alerts for applications and incidents near here
Timeline
- 24 July 2025 Planning application submitted
- 2 September 2025 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names David Lloyd Royal Berkshire - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has David Lloyd Royal Berkshire - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names David Lloyd Royal Berkshire - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of David Lloyd Royal Berkshire - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 29 September 2025.
- Where is David Lloyd Royal Berkshire - Solar Panels?
- On the edge of Bracknell, Berkshire, United Kingdom (postcode RG12 7PB).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).