Edgbarrow School, Grant Road - Solar Panels

Operator EEnergy Group plc

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 13 July 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Edgbarrow School, Grant Road - Solar Panels is a 0.2 MW solar farm in Crowthorne, Berkshire, United Kingdom. Its planning application (PA/2026/0431) went to Bracknell Forest on 29 April 2026 and was granted on 18 June 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 39 other energy sites within 10 km, 27 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

EENERGY GROUP PLC (05357433), active, since 2005. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Edgbarrow School, Grant Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1531, Fire involving solar panels damages roof of flats in Fleet, 11 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15312022Fire involving solar panels damages roof of flats in Fleet11 kmSignificant
EIR-12732022Solar panels believed to have started roof fire at house in Old Basing20 kmMinor
EIR-15192025Solar panels involved in outbuilding roof fire in Bourne End26 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
EEnergy Group plc
Location
Edgbarrow School, Grant Road, Berkshire, RG45 7HZ, United Kingdom
Planning authority
Bracknell Forest
Planning application
PA/2026/0431

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA/2026/0431, with what the planning evidence pack adds for this site.

Every application in Bracknell Forest · Alerts for applications and incidents near here

  • 29 April 2026 Planning application submitted
  • 18 June 2026 Planning permission granted

None found. The register holds no published incident that names Edgbarrow School, Grant Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Edgbarrow School, Grant Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Edgbarrow School, Grant Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Edgbarrow School, Grant Road - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 July 2026.
Where is Edgbarrow School, Grant Road - Solar Panels?
In Crowthorne, Berkshire, United Kingdom (postcode RG45 7HZ).