Solar · United Kingdom
The Gardens
Operator Warter Priory Farms
Planning Permission Expired0.3 MWData checked 16 November 2026Source record dated 31 March 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
The Gardens is a 0.3 MW solar farm 5.3 km east of Pocklington, Humberside, United Kingdom. Its planning application (19/04018/PLF) went to East Riding of Yorkshire on 5 December 2019 and was granted on 6 November 2020. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 16 other energy sites within 10 km, 3 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when The Gardens changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 0.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Planning Permission Expired
- Operator or applicant
- Warter Priory Farms
- Location
- The Gardens, Warter, York, North Yorkshire, Humberside, YO42 1XA, United Kingdom
- Planning authority
- East Riding of Yorkshire
- Planning application
- 19/04018/PLF
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 19/04018/PLF, with what the planning evidence pack adds for this site.
Every application in East Riding of Yorkshire · Alerts for applications and incidents near here
Timeline
- 5 December 2019 Planning application submitted
- 6 November 2020 Planning permission granted
- 27 January 2023 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names The Gardens. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has The Gardens had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names The Gardens; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of The Gardens?
- Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 31 March 2020.
- Where is The Gardens?
- 5.3 km east of Pocklington, Humberside, United Kingdom (postcode YO42 1XA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).