Planning pack for this site, £295Other options

Solar · United Kingdom

Soay Solar Farm and Greener Grid Park

Operator Statkraft Uk Limited · Owner Ministry Of Trade, Industry And Fisheries

Under Construction50 MWData checked 16 November 2026Source record dated 6 March 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Soay Solar Farm and Greener Grid Park is a 50 MW solar farm 3.4 km south-west of Pocklington, North Yorkshire, United Kingdom. Its planning application (21/04505/STPLF) went to East Riding of Yorkshire on 26 January 2022 and was granted on 28 November 2022. Construction started on 1 March 2026. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 21 other energy sites within 10 km, 8 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

STATKRAFT UK LTD (05742795), active, since 2006. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Soay Solar Farm and Greener Grid Park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1175, Rooftop solar panel fire guts NHS mental health ward in Malton, 26 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton26 kmSignificant
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster49 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof63 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
50 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Statkraft Uk Limited
Owner
Ministry Of Trade, Industry And Fisheries
Location
Three Cocked Hat Plantation, Waplington Lane, Allerthorpe, York, North Yorkshire, YO42 4RL, United Kingdom
Planning authority
East Riding of Yorkshire
Planning application
21/04505/STPLF

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 21/04505/STPLF, with what the planning evidence pack adds for this site.

Every application in East Riding of Yorkshire · Alerts for applications and incidents near here

  • 26 January 2022 Planning application submitted
  • 28 November 2022 Planning permission granted
  • 1 March 2026 Construction started

None found. The register holds no published incident that names Soay Solar Farm and Greener Grid Park. If you know of one, report it (confidential reports are anonymised).

Has Soay Solar Farm and Greener Grid Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Soay Solar Farm and Greener Grid Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Soay Solar Farm and Greener Grid Park?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 6 March 2026.
Where is Soay Solar Farm and Greener Grid Park?
3.4 km south-west of Pocklington, North Yorkshire, United Kingdom (postcode YO42 4RL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).